Lembaga Penyelidikan Ekonomi dan Masyarakat – Fakultas Ekonomi dan Bisnis – Universitas Indonesia

Potential and Cost of Electricity Generation from Municipal Solid Waste Incineration in Pekanbaru Municipality

November 22, 2022

Author : Bisuk Abraham Sisungkunon, Atiqah Amanda Siregar,  and Wildan Al Kautsar Anky

Executive Summary

Municipal solid waste (MSW) management remains a challenge in in Pekanbaru. To avoid the negative externalities associated with improper waste disposal, the development of waste-based power plant (or PLTSa), including through incineration technology, is increasingly viewed as an attractive option. This study estimated that electricity generation potential from MSW in Pekanbaru could reach 0.021 MW/ton MSW and levelized cost of electricity (LCOE) from incineration PLTSa is around 21.03¢ per kWh. Waste calori?c value and feedstock supply are essential to maintain the cost competitiveness of incineration PLTSa in Pekanbaru.

Download (PDF, 654KB)

Publikasi Terbaru

Raja Ampat dalam Bayang-Bayang Tambang: Haruskah Dilanjutkan?

Juli 9, 2025

Weathering the Storm: Examining the Resilience of Small and Micro Firms in Indonesia During the COVID-19 Pandemic

Juli 4, 2025

Inflasi Bulanan, Juli 2025 – Seri Analisis Makroekonomi

Juli 3, 2025

Government as Shareholder or Guardian? A Critical Look at SOE Policy in Indonesia

Juli 2, 2025

Publikasi Terkait

tambang raja ampat

Raja Ampat dalam Bayang-Bayang Tambang: Haruskah Dilanjutkan?

umkm

Weathering the Storm: Examining the Resilience of Small and Micro Firms in Indonesia During the COVID-19 Pandemic

inflasi juli

Inflasi Bulanan, Juli 2025 – Seri Analisis Makroekonomi

Positive SSL Wildcard