Potential and Cost of Electricity Generation from Municipal Solid Waste Incineration in Pekanbaru Municipality

November 22, 2022

Author : Bisuk Abraham Sisungkunon, Atiqah Amanda Siregar,  and Wildan Al Kautsar Anky

Executive Summary

Municipal solid waste (MSW) management remains a challenge in in Pekanbaru. To avoid the negative externalities associated with improper waste disposal, the development of waste-based power plant (or PLTSa), including through incineration technology, is increasingly viewed as an attractive option. This study estimated that electricity generation potential from MSW in Pekanbaru could reach 0.021 MW/ton MSW and levelized cost of electricity (LCOE) from incineration PLTSa is around 21.03¢ per kWh. Waste calori?c value and feedstock supply are essential to maintain the cost competitiveness of incineration PLTSa in Pekanbaru.

Download (PDF, 654KB)

Publikasi Terbaru

Analysis of Korean’s ODA Projects in Indonesia: Development Demands, Projects Performance, and Satisfaction

Juli 2, 2024

Seri Analisa Makroekonomi: Rapat Dewan Gubernur BI, Juni 2024

Juni 21, 2024

Riset LPEM FEB UI: GoTo Berkontribusi Signifikan Dorong 5 Sektor Penting Penggerak PDB Indonesia Tahun 2023

Juni 5, 2024

Ribut Soal Tapera: Kebijakan “Harga Mati” untuk Turunkan Angka Kekurangan Perumahan Nasional? – Special Report, Juni 2024

Juni 4, 2024

Publikasi Terkait

Korea in Indonesia

Analysis of Korean’s ODA Projects in Indonesia: Development Demands, Projects Performance, and Satisfaction

inflasi juni turun

Seri Analisa Makroekonomi: Rapat Dewan Gubernur BI, Juni 2024

Riset LPEM FEB UI: GoTo Berkontribusi Signifikan Dorong 5 Sektor Penting Penggerak PDB Indonesia Tahun 2023